Wednesday, 9 October 2013

SHELL shuts 150,000bpd pipeline in Ogoni

SHELL Press Statement

SPDC shuts TNP because of leaks

The Shell Petroleum Development Company of Nigeria Ltd (SPDC) today (October 9) shut the Trans Niger Pipeline (TNP) following reports of new leaks, barely 10 days after the line was repaired from crude oil theft incidents. Some 150,000 barrels oil is deferred.

The latest leaks were reported at B-Dere, Nonwa–Tai, and Bodo West all  in Ogoni land. SPDC shut the line as a precautionary measure after receiving reports of the incidents and has also mobilised a spill response team.

A joint investigation visit be conducted as soon as possible to determine the cause and impact of the spills.

Contact:
Precious Okolobo
Shell Spokesperson


No comments:

Post a Comment